Projects

October 1 – 7, 2022 MIESCOR - HANDLING OF ONE (1) UNIT 109 MT TRANSFORMER FOR BWPC WINDFARM

G7 handled transport of One (1) Unit Transformer Main Body weighing 109 MT, from Cargo receiving to foreign vessel, roll-on to barge, sea transport Manila to Caparispisan, Pagudpud Ilocos Norte, transport/pass thru from Caparispisan / Ayoyo Trail to Caunayan Middle Ridge to Foundation the (Challenge of the project) then unloading of transformer via Manual Jacking/skidding at site's foundation.

Cargo Dimension :
One (1) Unit Transfomer (Body)
L- 8.1 x W- 3.28 x H- 4.09 = 109 MT
Transport Challenge :
1st Weather Condition
2ND most critical part: Passing thru Ayoyo Ridge and Caunayan Middle Ridge, it requires more tractor/prime mover to ensure safe transport
Transport Methodology :
Transport by: 2 x 4 Axle lines MAT with Dropdeck Trailer

SEA TRANSPORT

TRANSPORT FROM CAPARISPISAN JETTY TO SITE

UNLOADING/SPOTTING VIA MANUAL JACKING/SKIDDING

HAULING/ TRANSPORT

UNLOADING SPOTTING

March 10-16, 2022 MIESCOR BUILDERS INC. - HANDLING OF ONE (1) UNIT 56 MT ABB TRANSFORMER

G7 handled transport of One (1) Unit Transformer Main Body weighing 65 MT, loading via Manual Jacking/skidding from Meralco Calumpit Substation to Meralco Ilo-ilo Substation

Cargo Dimension :
One (1) Unit Transfomer (Body)
L- 6.5m x 2.83m x 3.7m Weighing 65 MT
Scope of work:
  • Mobilization to Meralco Calumpit
  • Loading to trailer of transformer via manual jacking/skidding
  • Transport roll on to suitable LCT/Barge, seafastening
  • Roll off transport to Jobsite
  • Unloading/spotting to foundation via manual jacking/skidding
Transport Methodology :
Transport by: 6 Axle lines MAT

LOADING TO TRAILER VIA MANUAL JACKING/SKIDDING

TRANSPORT FROM CALUMPIT, BULACAN TO ILO-ILO

UNLOADING/SPOTTING VIA MANUAL JACKING/SKIDDING

Nov. 10-16, 2021 BENLINE AGENCIES PHIL. INC. - HANDLING OF ONE (1) UNIT 173 MT ABB TRANSFORMER

G7 handled transport of One (1) Unit Transformer Main Body weighing 173 MT, Shipside cargo receiving from Harbour Centre Barging to Mauban, Quezon Power Plant.

Cargo Dimension :
One (1) Unit ABB Transfomer (Body)
L- 7.80 x W- 3.76 x H- 4.84 = 173 MT
Scope of Work:
- Shipside cargo receiveing
- Barging to Mauban, Quezon Power Plant
- Roll-off transport to foundation area
Unload via Manual Jacking Skidding
Transport Methodology :
Received and Transport by: 14 Axle lines MAT
SHIPSIDE CARGO RECEIVING OF 247MT ABB TRANSFORMER
ROLL-OFF TO PAGBILAO PLANT JETTY, TRANSPORT TO PROPOSED LAYDOWN AREA
UNLOADING VIA MANUAL JACKING

Feb 3 - March 2, 2020 CEBU LINK JOING VENTURE (CLJV)- LAUNCHING GIRDER PROJECT

G7 handled transport of One (1) Unit Transformer Main Body weighing 109 MT, from Cargo receiving to foreign vessel, roll-on to barge, sea transport Manila to Caparispisan, Pagudpud Ilocos Norte, transport/pass thru from Caparispisan / Ayoyo Trail to Caunayan Middle Ridge to Foundation the (Challenge of the project) then unloading of transformer via Manual Jacking/skidding at site's foundation.

Cargo Dimension :
One (1) Unit Transfomer (Body)
L- 8.1 x W- 3.28 x H- 4.09 = 109 MT
Transport Challenge :
1st Weather Condition
2ND most critical part: Passing thru Ayoyo Ridge and Caunayan Middle Ridge, it requires more tractor/prime mover to ensure safe transport
Transport Methodology :
Transport by: 2 x 4 Axle lines MAT with Dropdeck Trailer

November 6-9, 2021 BENLINE AGENCIES PHILIPPINES - MAKBAN GEOTHERMAL POWER PLANT PROJECT

G7 handled the replacement of old 68KVA power transformer by new 68KVA power transformer and hustling of both transformer from and to temporary laydown area.

Cargo Dimension :
2 units of 68 MVA 43MT Transformer(Old and New)
2 Units of 2.3MVA 6T Transformer ( Old and New)
26 Pallets of Transformer Oils
Scope of Work:
Replacing of Old trafo of Newly delivered Transformer.
Hustling of Old trafo to temporary storage area.
Transport Challenge:
GCQ L3 - General Community Quarantine Level 3 in the middle of the project. Worked closely with different government agencies and client in navigating through uncertain environment to ensure successful project completion.

Hustling of Old trafo to TLA

Spotting/Positioning of New Trafo

Unloading/Spotting to Foundation

JUNE 14, 2020 - OCTOBER 31, 2020 BENLINE AGENCIES PHILIPPINES - MASINLOC POWER PLANT PROJECT

G7 handled the Direct Receiving, Hustling, Jacking and Delivery of One (1) Turbine Generator Set Composed with Four(4) Heavy Cargoes and its Accessories

Cargo Dimension :
One (1) Unit 65 MT Turbine Rotor Assembly 8.80x3.68x3.85m
One (1) Unit 40 MT LP Lower Part 5.49x4.48x3.24m
One (1) Unit 29.5MT LP Upper Part - 5.56x4.36x3.84m
One (1) Unit 23MT Turbine Rotor Assembly 8.04x1.78x1.87m
Transport Methodology :
Direct receiving and Hustling from port apron to PSA using 14Lines MAT and Manual Jacking Skidding for Loading and Unloading works
Transport Challenge:
GCQ - General Community Quarantine in the middle of the project. Worked closely with different government agencies and client in navigating through uncertain environment to ensure successful project completion.
Direct Receiving from Vessel
Hustling of Cargoes to Storage Area
Unloading/Hanging on Beams at Storage area

May 25 - June 1, 2021 FUJIAN- NGCP BANILAD S/S, CEBU PROJECT, TWO (2) UNITS TRANSFORMERS 113MT each

G7 most recent project for Fujian Electric Corp. Handling of 2 units transformer received at Cebu Port (CIP) & delivered to NGCP Banilad Substation, Cebu.

Scope of Work:
Cargo receiving, Customs Clearance, Transport & Unloading/spotting to foundation area.
Cargo Details:
Heavy Cargo:

Two (2) Units Transformer, L- 10.65 x 3.85 x 3.6 Weighing 113 MT each.
General Cargo:
Accessories/Loose Cargo
TRANSPORT FROM CIP TO SITE
UNLOADING/SPOTTING TO FOUNDATION AREA

September 2019 ECU WORLDWIDE- HANDLING OF ONE (1) UNIT 247MT ABB TRANSFORMER (BODY)

G7 handled transport of One (1) Unit ABB Transformer Main Body weighing 247 MT, Shipside cargo receiving of cargo from Harbour Centre Barging to Pagbilao Team Energy.

Cargo Dimension:
One (1) Unit ABB Transfomer (Body)
L- 8.99 x W- 4.09 x H- 4.3 = 247 MT
Scope of Work:
- Shipside cargo receiveing
- Barging to Pagbilao Team Energy Jetty
- Roll-off transport to foundation area
Jack-down/Unload trafo to foundation
Transport Methodology:
Received and Transport by: 14 Axle lines MAT
SHIPSIDE CARGO RECEIVING OF 247MT ABB TRANSFORMER
ROLL-OFF TO PAGBILAO PLANT JETTY, TRANSPORT TO PROPOSED LAYDOWN AREA
UNLOADING VIA MANUAL JACKING

February - April 2020 SUPREME POWER CORP. - HANDLING OF WARTSILA ENGINE & GENERATORS

G7 handled transport of Three (3) Units Warsila and Generators fromSto. Tomas & Sta. Rosa, Laguna Warehouse to Mati, Davao. From Pull-out to Spotting to foundation of engines.

Cargo Dimension:
3 Units 52 MT, Wartsila Engine
3 Units 18 MT, Hyundai Generators
6 Units 2.8 MT each, Fixing Rails
39 Packages total of 141.94 cbm
Transport Methodology:
Received & Transport by: 8 Axle lines MAT, Unload via Manual Jacking/Skidding
Transport Challenge:
ECQ – Enhanced Community Quarantine declared in the middle of the project. Worked closely with different government agencies and client in navigating through uncertain environment to ensure successful project completion.
Hauling to Batangas Port
Transport/Steaming to Davao
Unloading/Spotting to Foundation

Sept. 29 - Oct. 15, 2020 DB SCHENKER- DELIVERY OF MOBILE TRANSFORMERS

G7 delivered of Three (3) Units, each Mobile Transformers from its destination. NGCP Mexico, Pampanga & NGCP Daraga, Albay

Cargo Dimension:
3 Units Mobile Transformer per Site. Weighing 52 MT Each + Mobile Accessories
Transport Challenge:
Ensured compatibility of New Mobile transformer's fifth wheel to local Tractor Heads to ensure safe transport to destination.

 

back to top