DB SCHENKER – HANDLING OF 2 UNITS 300MVA TRANSFORMER FOR NAGA, CAM. SUR. AND SAN RAFAEL, BULACAN

Picture for news item DB SCHENKER – HANDLING OF 2 UNITS 300MVA TRANSFORMER FOR NAGA, CAM. SUR. AND SAN RAFAEL, BULACAN
Project Date: Sept. 27, 2019 – Oct. 17, 2019

G7 handled transport of 2 Units 300 MVA Transformer for NGCP San Rafael, Bulacan & NGCP Naga, Cam. Sur. From Cargo Receiving to unloading to Temporary Laydown Area

Cargo Dimension :
Two (2) Units 300 MVA Transformer,
162 MT & 168 MT
24 Packages (Flywood Box) Accss. Each Site 1 Package Transformer Oil (Pallet Drum)
Each 3 x 20 SOC Transformer Oil, 22MT
 
Project Challenge :
Transport Height: 4.05m
Transport Methodology :
Received by: 8 Axle lines MAT
Transport by: 2 x 7 Axle lines MAT w/ Dropdeck

STEAMING/TRANSPORT

UNLOADING VIA MANUAL JACKING